OSP FTTx
ISP (Installation & Maintenance):
MVS has dedicated splicing teams and can execute multiple Telecom projects simultaneously.
- 1 Termination and splicing using latest splicing Machines.
- 2 Installation of ODB, OSB, FTB, FDT, FAT housing in joint enclosures.
- 3 End-to-end testing of optical fiber using OTDR, Optical power meter, Optical Loss meter.
- 4 Operation & Maintenance